The Bridge – Gioia Tauro (RG)

  • Date: 2011
  • Location of Assignment: Gioia Tauro
  • Client: Ministry of Infrastructure and Transport, Port Authority of Gioia Taur
  • Main Duties: Detailed design of a structural arch bridge
  • Tipology of intervention: Completion and development of the sector north, final project viability
  • Coordinate: 38.462629,15.911458