Control Tower - Aeroporto di Palermo

Analysis of seismic safety levels of the Control Tower
  • Date: 2008
  • Location of Assignment: Airport of Palermo
  • Client: Enav S.p.a
  • Main Duties: Analysis of seismic safety levels of the Control Tower
  • Coordinate: 38.185248,13.102985